Select Page
ANG5785 - Mafube Coal: GRP Notification letter

ANG5785 – Mafube Coal: GRP Notification letter (English)

ANG5785 – Mafube Coal: GRP Notification letter (Zulu)

DBG6952 - Venetia Mine: Final Basic Assessment Report
DBG6952 – Venetia Mine: Final Basic Assessment Report (Part A)

DBG6952 – Venetia Mine: Final Basic Assessment Report (Part B)

 

 

DER8030: Decentral Energy Managers (Pty) Ltd – Draft Basic Assessment Report
DER8030: Decentral Energy Managers (Pty) Ltd – Draft Basic Assessment Report

Appendix A1 – A4

Appendix A5 – A8

Appendix B – F 

Appendix G1 – G3

Appendix G4 – G8

Appendix H

 

ESK5108 – Eskom Holdings Limited – Kilbarchan Power Station: Integrated Water Use Licence Application

Eskom Holdings Limited – Kilbarchan Power Station: Integrated Water Use Licence Application

Appendix A: Environmental Authorisation for Phytorem

Appendix B: Kilbarchan Alternatives and Options Analysis

Appendix C: Conceptual design Biological Passive Water Treatment Plant

Appendix D: Layout and Detail of the Chamber

Appendix E: Eskom Kilbarchan Motivation to Discharge Water

Appendix F: BAR Rehabilitation

Appendix G: Specialist Reports

Appendix H: Kilbarchan Phytoremediation

Appendix I: Method Statement Phytoremediation

Appendix J: Kilbarchan Monitoring Programme

EXX5725 – Exxaro Coal Central (Pty) Ltd: Final Dorstfontein EIA and EMP
EXX5725 – Exxaro Coal Central (Pty) Ltd: Final Dorstfontein EIA and EMP

Appendix A – Maps

Appendix B – Soils

Appendix C – PPP Chapter

Appendix D – Soils Impact Report

Appendix E – Fauna and Flora Impact Report

Appendix F – Wetland Assessment Report

Appendix G – Aquatics Impact Assessment Report

Appendix H – Hydropedology Report

Appendix I – Surface Water Impact Report

Appendix J – Hydrogeological Impact Assessment Report

Appendix K – Air Quality Impact Assessment Report

Appendix L – Noise Impact Assessment Report

Appendix M – Heritage Impact Assessment Report

Appendix N – Visual Impact Assessment Report

Appendix O – Traffic Impact Assessment Report

Appendix P – Draft Socio-Economic Assessment Report

Appendix Q – GHG Assessment

Appendix R – Financial Provision Report

Appendix S – Environmental Management Programme (Dorsfontein East)

Appendix T – Environmental Management Programme (Pit 1)

Appendix U – Historical Authorisation

Appendix V – Scoping Report Acceptance Letter

Appendix W – Extension Letter DMRE

HAR8385: Harmony Gold Mining Company Limited - Closure Plan for the Kusasalethu Mining Operation
HAR8385: Harmony Gold Mining Company Limited – Closure Plan for the Kusasalethu Mining Operation
KAL7339: Kalagadi Manganese (Pty) Ltd - Final EIA and EMP
KAL7339: Kalagadi Manganese (Pty) Ltd – Draft EIA and EMP

 

NAM5335 - Temo Coal Mining (Pty) Ltd: Integrated Water and Waste Management Plan
NAM5335 – Temo Coal Mining (Pty) Ltd: Integrated Water and Waste Management Plan
Appendix A – Maps
Appendix B – Site Layout Civil Design
Appendix C – Aquatics and Wetlands
Appendix D – Surface Water
Appendix E – Hydrogeological Assessment Temo Mine
Appendix F – Hydrogeological Assessment Pipeline
Appendix G – Method Statement
Appendix H – Public Participation

 

PAR7273 - Mogale Gold (Pty) Ltd: Final Environmental Impact Assessment Report and Environmental Management Plan Report

PAR7273 – Pan African Resources: Final Environmental Impact Assessment Report and
Environmental Management Plan Report

Part A

Part B

Part C

Part D

Part E

Part F

Part G

PAR7273 – Mogale Gold (Pty) Ltd: EA Notification

Rand Uranium (PTY) Limited - Cooke Operations Water Use Licence Application Appeal

Rand Uranium (PTY) Limited – Cooke Operations Water Use Licence Application Appeal: Appeal Notice

Rand Uranium (PTY) Limited – Cooke Operations Water Use Licence Application Appeal: WULA Appeal

Rand Uranium (PTY) Limited – Cooke Operations Water Use Licence Application Appeal: Appeal Index

SAS8608 – Sasol Mining (Pty) Ltd: Bosjesspruit Colliery: Draft BAR and EMP

SAS8608 – Sasol Mining (Pty) Ltd: Bosjesspruit Colliery: Draft BAR and EMP

Appendix A: EAP CV and Qualification

Appendix B1: Wetland Baseline and Impact Assessment

Appendix B2: Agricultural Compliance Statement

SAS8608 – Appendix C: Final Pipeline Routes

SMS8522: Stibium Mine 5MW Solar PV Project - Final BAR

SMS8522: Stibium Mine 5MW Solar PV Project – Final BAR (Part A)

SMS8522: Stibium Mine 5MW Solar PV Project – Final BAR (Part B)

SAS8465 – Sasol Mining Propriety Limited: Draft Scoping Report
UCD6802 - Exxaro Coal Mpumalanga (Proprietary) Limited: Final EIA and EMP

UCD6802 – Exxaro Coal Mpumalanga (Proprietary) Limited: Final EIA and EMP

Appendix A: EAP CV

Appendix B – Plans

Appendix C – Pubic Participation

Appendix D -Soils Assessment

Appendix E – Fauna and Flora Assessment

Appendix F – Wetlands Assessment

Appendix G – Aquatics Assessment

Appendix H – Hydropedology

Appendix I – Surface Water Assessment

Appendix J – Groundwater Assessment

Appendix K – Air Quality Assessment

Appendix L – Noise Assessment

Appendix M – Heritage Impact Assessment

Appendix N – Visual Assessment

Appendix O – Traffic Assessment

Appendix P – Blast and Vibration

Appendix Q – Social Report

Appendix R – Greenhouse Gas

Appendix S – Closure and Rehabilitation

Appendix T – EA Acknowledgement

Appendix U – Scoping Acceptance

Appendix V – NEMA Extension Request

COP6679 – Copper Sunset Sand (Pty) Ltd: Integrated Water and Waste Management Plan

COP6679 – Copper Sunset Sand (Pty) Ltd: Integrated Water and Waste Management Plan

COP6679 – Copper Sunset Sand (Pty) Ltd: Integrated Water and Waste Management Plan Appendices

DBG7651 - De Beers Consolidated Mines (Pty) Ltd Venetia Mines: Audit Report and EMPR

DBG6952 – De Beers Consolidated Mines – Venetia Mine: Environmental Audit Report

DBG6952 – De Beers Consolidated Mines – Venetia Mine: EMPr

 

ERG8401 – Far West Gold Recoveries (Pty) Limited: BAR and EMP
ERG8401 – Far West Gold Recoveries (Pty) Limited: BAR and EMP

Appendix A: EAP CV

Appendix B – Locality Maps

Appendix C – Wetlands 

Appendix D – Fauna and Flora

Appendix E – Heritage

 

EXX5725 – Exxaro Coal Central (Pty) Ltd: Draft IWWMP

EXX5725 – Exxaro Coal Central (Pty) Ltd: Draft IWWMP

Appendix A – EAP CV

Appendix B – Existing IWWMP

Appendix C – Existing IWUL

Appendix D – Surface Water Assessment

Appendix E – Wetland Assessment

Appendix F – Aquatic Assessment

Appendix G – Hydropedology Report

Appendix H – Groundwater Assessment

Appendix I – Closure Cost Assessment

Appendix J – Final EIA

 

HCI6929 - HCI Coal (Pty) Ltd: Palesa Colliery IWWMP Update and IWULA
HCI6929 – HCI Coal (Pty) Ltd: Palesa Colliery IWWMP Update and IWULA

 

IVA6895 - Ivanplats (Pty) Ltd: Final Environmental Impact Assessment and Environmental Management Plan Report
IVA6895 – Ivanplats (Pty) Ltd: Environmental Impact Assessment and Environmental Management Plan Report
IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix A)
IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix B)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix C)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix D)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix E)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix F)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix G)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix H)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix I)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix J)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix K)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix L)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix M)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix N)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix O)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix P)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix Q)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix R)

IVA6895 – Ivanplats (Pty) Ltd: EIA (Appendix S)

NAM7964 – Namane Generation (Pty) Ltd: Final Scoping Report

NAM7964 – Namane Generation (Pty) Ltd: Final Scoping Report – Construction and Operation of the 100MW Namane Generation Solar Photovoltaic Facility near Steenbokpan in the Limpopo Province

Appendix A: CV

Appendix B – Pre-App Meeting

Appendix C – Acceptance of the EA Application

Appendix D – PPP Report

Appendix E – Acceptance of FSR and PSEIA

Appendix F – Agricultural Compliance Statement

Appendix G – Avifauna Impact Assessment

Appendix H – Fauna and Flora Impact Assessment

Appendix I – Appendix I – Visual Impact Assessment

Appendix J – Heritage Impact Assessment

Appendix K -Environmental Management Programme

 

 

PAR7273 - Mogale Tailings Retreatment Operation: Final IWWMP

PAR7273 – Mogale Tailings Retreatment Operation: Final IWWMP (Part A)

PAR7273 – Mogale Tailings Retreatment Operation: Final IWWMP (Part B)

PAR7273 – Mogale Tailings Retreatment Operation: Final IWWMP (Part C)

PAR7273 – Mogale Tailings Retreatment Operation: Final IWWMP (Part D)

PAR7273 – Mogale Tailings Retreatment Operation: Final IWWMP (Part E)

PAR7273 – Mogale Tailings Retreatment Operation: Final IWWMP (Part F)

PAR7273 – Mogale Tailings Retreatment Operation: Final IWWMP (Part G)

SAS6632 – Sasol Mining (Pty) Ltd: BAR and EMP Sasol Coal Supply

SAS6632 – Sasol Mining (Pty) Ltd: BAR and EMP Sasol Coal Supply

 

SAS7766 - Sasol Mining Propriety Limited: Draft Scoping Report Tweedraai Expansion Project

SAS7766 – Sasol Mining Propriety Limited: Draft Scoping Report Tweedraai Expansion Project

SAS8406: Sasol Mining Propriety Limited - Draft EIA and EMP Report for the Construction and the Operation of the Destoning Project

SAS8406: Sasol Mining Propriety Limited – Draft EIA and EMP Report for the Construction and the Operation of the Destoning Project

SAS8406: Appendix A – CV of EAP and Qualifications

SAS8406: Appendix B – Plans

SAS8406: Appendix C – Comments and Response Report

SAS8406: Appendix D – Agriculture Compliance Statement

SAS8406: Appendix E – Wetland Impact Assessment

SAS8406: Appendix F – Fauna and Flora Impact Assessment

SAS8406: Appendix G – Aquatic Specialist Report

SAS8406: Appendix H – Surface Water Specialist Report

SAS8406: Appendix I – Groundwater Specialist Report

SAS8406: Appendix J – Air Quality Impact Assessment Report

SAS8406: Appendix K – Noise Specialist Report

SAS8406: Appendix L – Visual Impact Assessment

SAS8406: Appendix M – Heritage Impact Assessment

SAS8406: Appendix N – Social Specialist

SAS8406: Appendix O – Site Selection Report

SAS8406: Appendix P – Rehabilitation and Closure Plan

SAS8406: Sasol Mining Propriety Limited - Destoning Project Integrated Water Use Licence Application

SAS8406: Sasol Mining Propriety Limited – Destoning Project Integrated Water Use Licence Application

SAS8406 (IWWMP): Appendix A – Project Description

SAS8406 (IWWMP): Appendix B – Impact Assessment Methodology

SAS8406 (IWWMP): Appendix C – Plans

SAS8406 (IWWMP): Appendix D – Typical Design Layouts

SAS8406 (IWWMP): Appendix E1 – Terrestrial Ecology (Fauna and Flora) Impact Assessment

SAS8406 (IWWMP): Appendix E2 – Wetland Impact Assessment

SAS8406 (IWWMP): Appendix E3 – Hydropedology Technical Memo

SAS8406 (IWWMP): Appendix E4 – Surface Water Impact Assessment

SAS8406 (IWWMP): Appendix E5 – Groundwater Specialist Report

SAS8406 (IWWMP): Appendix E6 – Aquatic Specialist Report

SAS8406 (IWWMP): Appendix E7 – Social Impact Assessment

SAS8406 (IWWMP): Appendix E8 – Rehabilitation Decommissioning and Mine Closure Plan

 

 

Sibanye Gold Limited - Burnstone Gold Mine Water Use Licence Application Appeal

Sibanye Gold Limited – Burnstone Gold Mine Water Use Licence Application Appeal: Appeal Notice

Sibanye Gold Limited – Burnstone Gold Mine Water Use Licence Application Appeal: WULA Appeal

Sibanye Gold Limited – Burnstone Gold Mine Water Use Licence Application Appeal: Appeal Index Part A

Sibanye Gold Limited – Burnstone Gold Mine Water Use Licence Application Appeal: Appeal Index Part B

THA7842 – Arxo Metals (Pty) Ltd: Final Scoping Report

THA7842 – Arxo Metals (Pty) Ltd Final Scoping Report